Segment

Wachusett Greenways: Barre, Oakham, and Rutland
Stone Dust

An 8.8 mile section through Barre, Oakham, and Rutland. Highlights include the 70-foot-long Charnock Tunnel, the 98-foot long bridge over the Ware River, and the new culvert after Miles Road. The Charnock Cut, a stone cut by the Mass Central Railroad, is the highest point on the MCRT.

edit

Trails

The MCRT is a partly-complete 104-mile rail trail from Northampton to Boston along the former Mass Central Railroad route. Much of the trail, including the Norwottuck Branch Rail Trail and the Somerville Community Path, have been developed as separate projects but will serve as part of the complete Trail.

Timeline

2025 MassTrails Grant for construction of MCRT accessibility improvements in Rutland

October 7, 2025

Wachusett Greenways will construct an accessible portion of the Mass Central Rail Trail. The slope for the shared use path in Rutland east from Whitehall Road (Rutland State Park) reaches to 13%, while the new construction will reach a maximum of 3.2%. The project will also expand the parking lot and a trail connection to the MCRT.

Culvert after Miles Road built
Ware River Bridge Installed
Charnock Tunnel Installed