Segment

Waltham Sidewalk MCRT
On Road

While waiting for the MCRT Weston-Waltham Phase 2 project, the gap in Waltham can be travelled entirely using sidewalks and crosswalks.

Trails

The MCRT Wayside Branch is a partly completed, 23-mile section of the Mass Central Rail Trail designed, built, and maintained by the DCR in partnership with local communities. In 2010, the DCR executed a lease with the MBTA for the corridor, which passes through Waltham, Weston, Wayland, Sudbury, Hudson, and Berlin, and with small pieces in Stow, Bolton and Marlborough.

Timeline