Segment

Wakefield Rail Trail
Paved

This 0.91 mile portion of the Wakefield Rail Trail was paved by National Grid as part of the Woburn to Wakefield underground electric transmission line installation within the MBTA ROW.

Trails

The Wakefield Rail Trail has 0.91 miles paved, and is planned to be 1.9 miles: 1.6 miles from Fosters Lane to the Galvin Middle School, and 0.3 miles to the Wakefield border with the Lynnfield-Wakefield Rail Trail - Phase 2 project.

Timeline