Welcome! Configure the map settings below and select a trail on the map to learn more.
Trails
Layers
Last Updated: 24 days ago
mass.trail.tracker@gmail.com
Segment
MCRT Waltham-Weston Phase 1 with Stony Brook Bridge
This 0.3 mile trail includes the Stony Brook Bridge, a steel riveted lattice truss bridge built in 1896. The bridge crosses over the MBTA Fitchburg Commuter Rail Line. Opened in August 2025.
Trails
The MCRT Wayside Branch is a partly completed, 23-mile section of the Mass Central Rail Trail designed, built, and maintained by the DCR in partnership with local communities. In 2010, the DCR executed a lease with the MBTA for the corridor, which passes through Waltham, Weston, Wayland, Sudbury, Hudson, and Berlin, and with small pieces in Stow, Bolton and Marlborough.
The MCRT is a partly-complete 104-mile rail trail from Northampton to Boston along the former Mass Central Railroad route. Much of the trail, including the Norwottuck Branch Rail Trail and the Somerville Community Path, have been developed as separate projects but will serve as part of the complete Trail.
Since 1991, the East Coast Greenway Alliance has led the development of more than 1,000 miles of protected greenways and continues to advance a safe, connected corridor for walking, biking and active transportation from Maine to Florida.
MassTrailTracker shows just a partial version of the East Coast Greenway: please go to East Coast Greenway website below for more information.
Timeline
October 2022
DCR hosted a listening sessions and presented 25% designs for both the bridge over Route 128 and the bridge over the MBTA Fitchburg Line tracks.
Later, the project was split into Phase 1 (MBTA bridge) and Phase 2 (Route 128 bridge) to accelerate Phase 1 construction, as Phase 2 would have an undetermined timeline from the 1265 Main Street roadway reconfiguration blocker.
December 30, 2010
Shortly after the theft of MBTA property in Berlin is discovered, the MBTA agrees to lease it's property, at no cost, to the Massachusetts Department of Conservation and Recreation (DCR). DCR now has the right to construct a 23 mile State Park between Waltham and Berlin. Securing funding for design and construction will be an ongoing challenge.
The trail name is now: the Mass Central Rail Trail - Wayside, in recognition that the 23 mile Wayside trail is a member of the 104 mile Mass Central Rail Trail.
April 1997
The "Central Massachusetts Rail Trail Feasibility Study" was commissioned by the Massachusetts Turnpike Authority, which found construction of a 25-mile (40 km) trail from Berlin to Belmont to be feasible.
The Wayside Rail Trail Committee, a 501(c)(3) nonprofit, is formed to advocate for the trail. WRTC President Andrew Greene quickly proposes the "Wayside" Rail Trail name. In Sudbury, the proposed trail is adjacent to the site of the former Wayside Inn Railroad Station, near the historic Wayside Inn, in turn associated with Henry Wadsworth Longfellow's classic novel "Tales of the Wayside Inn".
1980
Once the Massachusetts Central Railroad chartered in 1869, this railroad section eventually became the MBTA's Central Mass Branch. Due to low ridership, the final passenger train rain in 1971. By 1980 the last freight train ran west of Waltham. (In 1994, the final freight train in Waltham ran between Bacon Street and Clematis Brook.)
An extensive history of the final days of the Central Mass Branch is presented by the talk below.