Contribute
About
Map
Map
About
Contribute
Admin
/
Events
/
Event 32
Event 32
Headline
Date
Date Precision
Description
By 2021, the existing paved pathway surface in Linear Park had deteriorated. The pathway, originally paved around 1985, had become uneven and difficult to traverse in places. The irrigation system to water Linear Park’s trees and grass had become inoperable. The pathway and Linear Park suffered from poor drainage resulting in the pooling of water and ice that were dangerous to pedestrians and cyclists. The light poles were old and provided poor illumination to Linear Park, generating safety concerns. The 10-foot width of the pathway provided bicyclists and pedestrians limited space to pass or maneuver. Cambridge reaches out to the public with a plan to address all these issues and Reconstruct the Linear Park.
Links
(add link)
Text
URL
Text
URL
Delete Segment
Cancel
Save
Day
Month
Season
Year
Press space bar to start a drag. When dragging you can use the arrow keys to move the item around and escape to cancel. Some screen readers may require you to be in focus mode or to use your pass through key