DCR hosted a listening sessions and presented 25% designs for both the bridge over Route 128 and the bridge over the MBTA Fitchburg Line tracks. Later, the project was split into Phase 1 (MBTA bridge) and Phase 2 (Route 128 bridge) to accelerate Phase 1 construction, as Phase 2 would have an undetermined timeline from the 1265 Main Street roadway reconfiguration blocker.